See how 250 serial device servers and 150 fiber-capable industrial switches standardized protection and measurement data collection for a ±800 kV HVDC project.

INDUSTRYAPPLICATION
Power & EnergyPower transmission and substation automation

Introduction

The Longdong-Shandong ±800 kV UHVDC project needed to bring a large population of serial protection and measurement devices into an Ethernet-based monitoring environment. A cabinet-level architecture converted RS-232/422/485 data close to each device, aggregated it locally, and used fiber for the long-distance uplink.

The Longdong-Shandong project is China’s 18th UHVDC project and the country’s first ±800 kV UHVDC scheme integrating wind, solar, thermal power, and energy storage. The route crosses five provinces, carrying renewable electricity from the Longdong region toward load centers in Shandong.

Within the substation environment, protection, measurement, and other intelligent electronic devices generate operational data that must be collected centrally and made available for remote management. The communication hardware operates near high-voltage switching equipment and is exposed to substantial electromagnetic disturbance.

Many field devices communicate through RS-232, RS-422, or RS-485. Those serial interfaces cannot be connected directly to the substation’s upper-layer Ethernet network, yet their data must be acquired consistently and accessed remotely.

Using one-off protocol gateways or long copper runs for each device would increase cabinet complexity, create inconsistent configurations, and expose more of the communication path to interference. The project needed a standardized serial-to-Ethernet pattern that could be repeated across a large installed base.

Requirements

The design had to scale to hundreds of cabinet-level connections without turning installation and commissioning into hundreds of unique integration tasks. It also had to fit existing intelligent equipment cabinets and support the serial interfaces already used by protection and measurement devices.

  • Provide transparent conversion from RS-232/422/485 serial data to Ethernet.
  • Support unified data acquisition and remote management from the upper-layer network.
  • Use fiber for long-distance transmission and improved immunity to electromagnetic interference.
  • Operate around disconnectors, circuit-breaker switching, load changes, and lightning-related disturbances.
  • Keep the cabinet architecture simple enough to deploy and maintain at a 400-device scale.

Solution

Each MPort3101 serial device server is installed close to the protection or measurement equipment. It converts the local RS-232/422/485 data into Ethernet traffic before that data leaves the cabinet. A MIEN1203-F industrial Ethernet switch then aggregates multiple converted device streams and provides the fiber interface for the upstream connection.

This division of roles keeps serial connections short, standardizes the handoff to Ethernet, and avoids carrying sensitive copper links over long distances. The same cabinet-level pattern can be repeated, which reduces configuration variation and gives maintenance teams a consistent fault-isolation boundary.

Deployment and Verification

The project brief records deployment of 250 MPort3101 serial device servers and 150 MIEN1203 industrial Ethernet switches. Serial servers were mounted directly in intelligent equipment cabinets, while the switches aggregated local data and carried it upstream through fiber links.

Operational verification focused on correct serial-port parameters, transparent end-to-end data conversion, reachability from the upper-layer network, and stable fiber transport in the substation environment. The available brief does not publish packet-loss, EMC test, or commissioning-duration figures, so no numerical performance claim is added here.

Featured Products

Results

The architecture reduced integration risk by replacing a collection of serial-specific upstream connections with a standard Ethernet handoff. Fiber uplinks also reduced the length of copper paths exposed to the substation’s electromagnetic environment.

  • Lower protocol-integration risk through a consistent serial-to-Ethernet conversion layer.
  • Less commissioning variation because the same cabinet pattern is repeated across the project.
  • Reduced long-distance copper exposure by moving converted traffic onto fiber near the field devices.
  • Faster maintenance isolation because serial conversion, local aggregation, and the fiber uplink have clear boundaries.

Contact us to Get Assistance for Your Business

More Cases Studies

Standardizing Serial Data Collection Across a ±800 kV HVDC Project

check

Reducing Single-Path Risk in a 100 MW/200 MWh Battery Storage Network

check

Designing Low-Latency Wireless Machine Connectivity for BYD Electronics’1.7 Million m² Smart Factory

check

400 MWh BESS Redundant Network | Maisvch Case Study

check

Reliable SCADA Networking for a 700MW Desert Wind Farm

check

Industrial 4G Router Solution for EV Charging Station Upgrades | Maisvch Case Study

check