Seamless BMS and PCS Integration for a 200 MWh Grid-Scale BESS | Maisvch

Seamless Network Reliability for a 100 MWh Grid-Scale Battery Energy Storage System

A provincial-level energy provider developed a landmark 50MW/100MWh Battery Energy Storage System (BESS) to serve as a new regional power dispatching hub. To guarantee uninterrupted grid support and operational safety, the project required a fault-tolerant communication network with zero downtime. Maisvch provided a redundant industrial Ethernet solution, ensuring maximum reliability for the system’s critical Energy Management System (EMS).

Introduction

As the world transitions to renewable energy, large-scale Battery Energy Storage Systems (BESS) are becoming essential components of a stable and modern power grid. They balance supply and demand, store excess energy, and provide critical grid support services. Recognizing this, a forward-thinking energy company initiated the development of a large-scale, centralized 100 MWh energy storage station. This facility was designated as a key demonstration project for building the next generation of provincial power systems.

The primary objective was to create a highly reliable and efficient power dispatching hub. Unlike smaller, distributed storage units, this centralized approach optimizes land use, simplifies maintenance, and enhances safety. However, this centralization also means that the reliability of the entire facility hinges on the performance of its underlying communication network, which connects hundreds of sensors, controllers, and monitoring devices to the central Energy Management System (EMS).

Requirements

To achieve the project’s ambitious goals for grid stability and safety, the communication network had to meet several stringent requirements:

  • Fault-Tolerant Network for Uninterrupted Operation

The Energy Management System (EMS) requires constant data flow for both monitoring and control. Any interruption could compromise grid stability. The system integrator mandated a “zero-downtime” network architecture. This required complete redundancy, where an independent backup network could take over instantly in case of any switch, cable, or port failure on the primary network.

  • High-Bandwidth, Integrated Monitoring for Enhanced Safety

For proactive safety management, each battery cabinet needed to be monitored in real-time. This included streaming high-definition video feeds and transmitting continuous environmental data (e.g., temperature, humidity, smoke detection). The network had to provide sufficient bandwidth for this data-intensive monitoring without interfering with critical control signals, allowing the EMS to detect and respond to potential hazards instantly.

  • Industrial-Grade Durability

The networking equipment would be deployed inside energy storage containers, where it would be subjected to fluctuating temperatures, electromagnetic interference (EMI), and vibration. All components had to be industrially hardened to ensure long-term, reliable performance without failure in these challenging conditions.

Solution

Maisvch designed a multi-layered, fully redundant industrial network to serve as the bulletproof communication backbone for the BESS. Our solution directly addressed all system requirements by creating five parallel communication networks within each battery cabinet cluster, ensuring absolute separation of traffic and complete redundancy for critical paths.

The core of the solution is a dual-redundant architecture for both primary data and control signals. We established two physically separate networks—Network A and Network B—for both the data acquisition system and the control system. If any component on Network A fails, its counterpart on Network B seamlessly maintains communication. Furthermore, a fifth, dedicated network was deployed exclusively for video surveillance traffic, powered by our industrial PoE switches. This segmentation prevents high-bandwidth video from impacting the real-time performance of the control network.

Over 50 Maisvch industrial managed switches were deployed to build this robust topology, providing the reliability, performance, and management features necessary for a mission-critical power application.

Featured Products

Results

By partnering with Maisvch, the energy provider built a BESS facility with a communication network that meets the highest standards of reliability and safety.

  • Maximized System Uptime and Grid Reliability

The fully redundant network design provides a fault-tolerant foundation, eliminating single points of failure and ensuring the BESS is always online to support the power grid.

  • Proactive Safety Management

The dedicated, high-performance monitoring network allows the EMS to receive real-time video and environmental alerts, enabling predictive maintenance and immediate response to safety events, significantly reducing operational risks.

  • Simplified Network Management

The intelligent management features of Maisvch’s switches allow operators to remotely monitor network health, diagnose issues, and configure devices, lowering long-term maintenance costs.

  • A Future-Proof Foundation for Power Hub

The robust and scalable Gigabit network provides a solid foundation for future expansion and the integration of new IIoT technologies, ensuring the facility remains a state-of-the-art asset for years to come.

For more information about Maisvch industrial networking solutions for energy storage and power generation applications, contact our technical specialists or explore our complete product portfolio.

Contact us to Get Assistance for Your Business

More Cases Studies

Standardizing Serial Data Collection Across a ±800 kV HVDC Project

check

Reducing Single-Path Risk in a 100 MW/200 MWh Battery Storage Network

check

Designing Low-Latency Wireless Machine Connectivity for BYD Electronics’1.7 Million m² Smart Factory

check

400 MWh BESS Redundant Network | Maisvch Case Study

check

Reliable SCADA Networking for a 700MW Desert Wind Farm

check

Industrial 4G Router Solution for EV Charging Station Upgrades | Maisvch Case Study

check